− xii −
It is intended that other appropriate SRT can be used to supplement a SRCT as long as the work does not
overlap. If there is overlapping work, do not use a SRCT.
How To Use This Manual
1. Determine the actual work performed:
− Obtain this information from the work description on the repair order.
2. Determine the Accessibility Code:
− Determine the application from the repair order.
− Look in the “Accessibility Code Listing” on page to determine the accessibility code for the application
involved in the repair. If the application is not shown, assume the accessibility code is “B”.
− Write down the code.
3. Determine applicable SRCT:
− Find the Contents Page for Group 99 − Standard Repair Combined Times.
− Compare the titles to the work performed to determine if a SRCT will apply.
− If there is a SRCT that seems to apply, find that SRCT and compare the SRT within the SRCT to the
work performed. If you are not sure of the work included in the SRT, read that SRT and compare the
procedure listing with the work performed.
− If a SRCT applies to all or part of the work performed, find the column that contains the same accessi-
bility code determined in Step 2 above.
− Move down the column to the line containing the SRCT code and title and pick out the appropriate
time.
− If all the work in the SRCT is performed and additional steps were taken, use the SRCT and continue
to Step 4 to cover the additional work.
− If there is NOT an appropriate SRCT, move to Step 4.
4. Determine the appropriate repair SRT:
− Use the information from the repair order to identify the parts involved.
− Use the contents page at the front of the manual or the alphabetical index in the back of the manual
to determine the appropriate SRT group for the parts and/or work involved.
− Find the contents page for that group.
− Read the contents page for procedure titles that seem to correspond to the work performed.
− Find the SRT within the group.
− Read the SRT procedure listing to determine the work included.
− If the work performed and the work included in the SRT are the same, all or in part, determine and
record the time.